Set Pump/Master Valve Operation

The default is for all stations to have the master valve/pump start circuit ON. The master valve/pump start can be set ON or OFF by station, regardless of which program the station is assigned. This feature may be utilized on systems where it is desirable for a booster pump not to operate with certain zones.

To program pump operation:

  1. Turn the dial to SET PUMP OPERATION position.
  2. Press the or buttons to toggle the Master valve/pump start ON or OFF for the specific station.
  3. Press the button to advance to the next station.
  4. Repeat steps 2 and 3 for all necessary stations.