Set Pump/Master Valve Operation
The default is for all stations to have the master valve/pump start circuit ON. The master valve/pump start can be set ON or OFF by station, regardless of which program the station is assigned. This feature may be utilized on systems where it is desirable for a booster pump not to operate with certain zones.
To program pump operation:
- Turn the dial to SET PUMP OPERATION position.
- Press the
or buttons to toggle the Master valve/pump start ON or OFF for the specific station.
- Press the
button to advance to the next station. - Repeat steps 2 and 3 for all necessary stations.
|