P2C - Set Pump/Master Valve (P/MV) Operation (On/Off)

All stations have the P/MV start circuit ON in the default setting.
To program P/MV operation:

 

  1. Turn the dial to the PUMP position.
  2. Press the + or - buttons to toggle the P/MV start ON or OFF for the specific station.
  3. Press the → button to advance to the next station.
  4. Repeat steps 2 and 3 for all necessary stations.

أما زلت بحاجة إلى مساعدة؟ نحن هنا.

أخبرنا بما تحتاج إلى دعم بشأنه، وسنجد لك أفضل حل.

الاتصال بالدعم