Profissionais de irrigação certificados - Page 3

About this event

Campos Esportivos: A Oportunidade

Webinar: https://event.on24.com/wcc/r/3701451/82AEA1E867E7A796ED761F708B1C719F.

About this event

Productos para riego localizado y sus aplicaciones

Webinar: https://event.on24.com/wcc/r/3658729/12F53F066F29FE386036F435797E2D15

  • 16:00 PM- 17:00 P.M. - Mexico
  • 17:00 - 18:00 P.M. - Chile
  • 18:00 - 19:00 P.M. - Buenos Aires/Montevideo
  • 18:00 - 19:00 P.M. - Uruguay

About this event

Riego eficiente en 10 pasos

Webinar: https://event.on24.com/wcc/r/3658694/E2C70DC6E37FA77A173AE8C911CF1CC9

  • 16:00 PM- 17:00 P.M. - Mexico
  • 17:00 - 18:00 P.M. - Chile
  • 18:00 - 19:00 P.M. - Buenos Aires/Montevideo
  • 18:00 - 19:00 P.M. - Uruguay

About this event

Programadores Autónomos para Pequeñas Áreas

Webinar: https://event.on24.com/wcc/r/3658722/27BF26EED8A499ABFCC7055E43AEFAD4

  • 16:00 PM- 17:00 P.M. - Mexico
  • 17:00 - 18:00 P.M. - Chile
  • 18:00 - 19:00 P.M. - Buenos Aires/Montevideo
  • 18:00 - 19:00 P.M. - Uruguay

About this event

Campos Deportivos - La oportunidad.

Webinar: https://event.on24.com/wcc/r/3658681/8C6E4E9579D2E3D2599E1ED03D46ABC8

  • 15:00 PM- 16:00 P.M. - Mexico
  • 18:00 - 19:00 P.M. - Chile
  • 18:00 - 19:00 P.M. - Buenos Aires/Montevideo
  • 18:00 - 19:00 P.M. - Uruguay

The word USED displayed on the Pro-C Controller represents a landscape lighting station that was assigned. Once a start time is assigned to program L1, it turns station 1 from an irrigation station to a lighting station (same for L2 and L3). As a result, when creating programs for irrigation A, B, or C, station 1 will show USED since L1 has been assigned a start time. All irrigation stations will be wired using the next available station(s). Learn more 

USA

About this event

Instalação de um Sistema de Irrigação Comercial por 2 cabos.

Webinar: https://event.on24.com/wcc/r/3631727/0F42A9756EFC747FC77B549777CB28FD.

About this event

Instalación de un Sistema de Riego Comercial por 2 cables

Webinar: https://event.on24.com/wcc/r/3627913/38881C6B825D598EBEE194BB3A0EB882

  • 15:00 PM- 16:00 P.M. - Mexico
  • 18:00 - 19:00 P.M. - Chile
  • 18:00 - 19:00 P.M. - Buenos Aires/Montevideo
  • 18:00 - 19:00 P.M. - Uruguay

The HYDRAULIC SUMMARY is a report of exactly how the controller hydraulics are set up at the moment. It shows the connections of all flow-related objects, from MainSafe zones (if applicable), Flow Zones, Flow Sensors, P/MVs, to individual stations.

USA

LEARNING FLOW is an important step in the Flow Monitor setup (unless the MainSafe™ option is enabled) process.

  • Flow learning will only test stations that already have a Run Time in a program.
  • Flow learning will cancel all other irrigation, automatic and manual until the learning is complete. 
  • Flow cannot be learned while other stations are running for other reasons.
USA

Pages